The UK subscription rules are due to apply to contracts entered into on or after 1 January 2027. On 24 November 2026 that date is still the government’s plan and the date written into the draft Regulations, but it is not yet law. This page tracks what has happened and what is still missing, and it is updated as each step happens.
The short answer
Plan for 1 January 2027. Every official document since August says January, the Commons committee agreed the motion on 23 November without a division, and the minister told MPs the government had considered a grace period and decided against one. Pages that still say “spring 2027” were written before the August announcement.
What has happened so far
| When | What happened | Source |
|---|---|---|
| April 2026 | The government’s response to its consultation says the rules will start in spring 2027. | consultation response |
| 10 August 2026 | The Prime Minister brings it forward: “New rules will now come into force in January 2027”. | PM announcement |
| 19 October 2026 | The draft Regulations and a second instrument of consequential amendments are laid before Parliament. Both say they come into force on 1 January 2027. The draft guidance is published. | reg 1(2) SCRs |
| 3 November 2026 | The Lords Secondary Legislation Scrutiny Committee draws the draft to the special attention of the House. The issue is refunds on perishable goods such as meal kits, not the date. | SLSC 16th report |
| 4 November 2026 | The Joint Committee on Statutory Instruments does not report it. | JCSI |
| 23 November 2026 | The Commons Delegated Legislation Committee debates both instruments and agrees that it has considered them. The minister repeats 1 January and rules out a grace period. | Hansard, 23 Nov 2026 |
| 25 November 2026 | Lords Grand Committee debate (scheduled). | Lords business |
| Still to come | An approval vote in each House; the Regulations are then made and given an SI number; and the Secretary of State makes commencement regulations bringing the Act’s subscription chapter into force. | s.339(1) DMCCA |
What the minister said on 23 November
Kate Dearden, the minister, opened the debate by saying the regulations “will commence on 1 January to ensure that we can protect consumers soon”, subject to approval. On a grace period, she told the committee: “We felt that that would risk confusion and uncertainty for consumers and for businesses, and we therefore did not think it was appropriate in these circumstances.” She pointed instead to the CMA, which has said its focus in the early months will be on supporting businesses, and added that businesses “should not assume that support for compliance means that enforcement of the rules is being delayed”.
MPs on both sides raised the cost of refunds for fresh-food and meal-kit businesses, and Graham Stuart MP, a former publisher of periodicals, asked for magazines to be treated the same way. The minister did not announce any change to the draft. She said the government would keep the impact under review.
What is still missing
- Approval by both Houses. The Regulations follow the draft affirmative procedure, so each House has to vote to approve them before they can be made.
- The made Regulations. Once approved, the Regulations are signed and published on legislation.gov.uk with an SI number. Their content should be the draft as laid.
- Commencement of the Act itself. The duties in sections 253 to 281 of the DMCCA are not yet in force; only the powers to make regulations under them are. They need commencement regulations under s.339(1), which do not go through Parliament. The latest commencement instrument on legislation.gov.uk on 24 November 2026 is No. 3 (SI 2026/284, amended by SI 2026/1040), and it does not touch the subscription chapter.
- The final guidance. The October guidance is a draft. Expect a final version close to the start date.
What the date means in practice
- A customer who signs up on 31 December 2026 is not caught, even when their plan renews in 2027 s.275(3); reg 2(2) SCRs; guidance FAQ 1-2. Existing subscribers explains where the line falls.
- A customer who signs up on 1 January 2027 is caught from the first moment: the key information has to be on the page they sign up on, and their first reminder may be due within days if they start on a short trial.
- Pages, emails and cancel routes need to be ready on the 1st, not in the first week of January.
The things to do in December are in what changes on 1 January 2027, and the wording to copy is in the free templates.